Search Results

The default setting for search results displays All Content. If you prefer to see recent content only, please adjust the date filter.

117 Results Found

The results of chlorine dioxide use after 23 years — Part 1

John Hopkins Hospital conducted extensive review and analysis when developing its Legionella prevention plan

Enhancing health care facility safety

The role of design and commissioning in infection prevention and control

Optimizing infrastructure to reduce downtime

Employing best practices to ensure maximum reliability and efficiency in mission-critical operations

Reinventing restroom cleanliness in health care

Facilities managers must consider user perception, hygiene data, touch-free technology and environmental responsibility

The new rules of health care readiness

Why restoration must rise to the challenge when the built environment is viewed through a clinical lens

Assessing International Plumbing Code updates for chemical waste drainage

Learn how the 2024 International Plumbing Code defines approved materials for chemical waste drainage

Paving the way to cost savings

A pavement management program that begins with the end-goal in mind will save costs and extend asset life

Engineering solutions for hospital noise

Evidence-based planning and design approaches to improve HCAHPS ‘quiet at night’ scores

Collaboration between construction and facilities management

Establishing project leadership and team dynamics to ensure projects are ready for Day One and beyond

The results of chlorine dioxide use after 23 years — Part 2

Testing conducted across multiple Johns Hopkins facilities shows promising results for eliminating Legionella in water systems